| A short update but some big changes today. Work continues on the train tracks but should be wrapping up very shortly. |
 |
| Over to the main construction site, we find a busy scene with the pile driver still on site after putting in a lot of steel sheet pile. |
 |
| Usually, sheet pile is put in to form trenches and after seeing how long the steel was, this is going to be a deep trench. |
 |
| Closer view of the work. |
 |
| The bridge has now been put into place for the new pathway. |
 |
| Getting closer to SkyRide, there is heavy activity to get a lot of work completed before the train ride opens up again. |
 |
| More sheet pile for what is believed to be a trench. On top of the area you can see rebar that will be for crossing a gap in the sheet pile. |
 |
| Here's that gap waiting for the rebar. |
 |
| Yet another fairly large hole was being dug out when I visited. Note at the top the rebar and the workers putting in piping. |
 |
| A look back towards the train tracks and all the work going on around it. |